
Structure and water
A ledger connection has two distinct jobs to consider: transferring load appropriately and keeping water out of the house assembly.
Existing conditions matter
Cladding, rim construction and concealed damage can change the approach. The details should fit the actual house.
Plan before covering
Flashing and connections are easier to evaluate before finishes conceal them. Follow the approved design and required inspection sequence.
